Design intent
Contents |
[edit] Introduction
The term 'design intent' is an ambiguous one with several different possible meanings.
[edit] Client intent
ASHRAE Guideline 1-1996, The HVAC Commissioning Process, defines the term 'design intent' as '…a detailed explanation of the ideas, concepts, and criteria that are defined by the owner to be important'.
It suggests that this is developed before the design process begins and sets out what the 'owner' thinks is important. It defines the engineer's scope of work from the owners perspective and may be developed by the owner in conjunction with the engineer. Setting out intent in this way provides a mechanism by which subsequent proposals can be assessed to verify whether they satisfy the intent.
[edit] Early design stages
The term 'design intent' is sometimes used to refer to early design decisions, that is, what the designer intends to design. This has resulted in a whole range of documentation prepared in the early stages of a project being marked as 'design intent', when in fact they just set out preliminary design thinking.
[edit] Designer's intent
Designer's intent may refer more specifically to drawings and other information prepared by the project team that convey the fundamental, intrinsic requirements of a design. Where drawings go beyond showing just these basic requirements and include more detail, they might be referred to as working drawings.
Shop drawings are then prepared by contractors, subcontractors, suppliers, manufacturers or fabricators. These take the design intent drawings and other information and develop them to show in detail how the component will actually be manufactured, fabricated, assembled or installed.
Shop drawings can then be reviewed by the project team to determine whether they meet the design intent.
[edit] Design intent model
PAS 1192-2:2013 Specification for information management for the capital/delivery phase of construction projects using building information modelling (BIM) (now replaced by BS EN ISO 19650) suggests that during the design process, the initial version of the building information model developed by design suppliers might be described as the 'design intent model'.
This should show, '…the architectural and engineering intentions of the design suppliers'. Then, when ownership of the model is transferred to the construction suppliers, it is developed into a virtual construction model containing all the objects to be manufactured, installed or constructed.
See Design intent model for more information.
[edit] Parametric modelling
Building information modelling (BIM) has introduced a certain amount of parametric modelling into mainstream building design.
Parametric modelling (or parametric design) is the creation of a model based on a series of pre-programmed rules or algorithms known as 'parameters'. That is, the model, or elements of it, are generated automatically by internal logic arguments rather than by being manually manipulated.
It is important when using parametric modelling that the 'design intent' is clearly understood and properly defined so that if an element changes, the design intent remains intact. For example, if a junction needs to be in the middle of an element, it needs to be expressed that way, rather than as a fixed dimension from an edge, because if the size of the element changes, the junction needs to remain in the middle, rather than the original distance from the edge.
See Parametric modelling for more information.
[edit] Descriptive information
NB The RIBA Plan of Work published by the RIBA in 2020 defines descriptive Information (or design intent) as: ‘The means by which the design team describes a Building System in a manner that allows a specialist subcontractor to design the system.’ For more information see: Descriptive information
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
























Comments
The use of BIM and VR has now been consolidated into a framework known as Virtual Design and Construction (VDC) that outlines the implementation of a fully digital workflow from design to construction. This is currently being pioneered by certain countries like Singapore that is pushing for a greater shift to digitisation within the industry.
Read More at https://vrcollab.com/posts/why-include-vr-in-bim-execution-plan/